Sprint 36 Demo


 

Agenda

  1. ODE Sprint Demo
  2. CVP/RDE Sprint Demo
  3. Open & Requirements Discussion

Sprint Overviews

CV PEP: Sprint 23

 Click here to expand...

Accomplishments - Completed

  • Continuing coordination with the SDC team to perform transition from the legacy CVPEP environment to the SDC environment
    • Setting up access credentials
    • Setting up development and test environment
In the legacy CVPEP environment:
  • Supported WYDOT:
    • Loaded controllers.csv data into the Data Warehouse
      • Table: wydot_speed_controllers
      • For location correlation with speed data
    • Updated speed data tables to include “meaningful” data types
      • “int” and “float” data types to replace “string”
      • TIMESTAMP data type for the date and time fields to replace “string”
    • Helped with the cleanup of VSL data

  • Supported Volpe WYDOT
    • Created “flat” tables to store BSM and TIM data for ease of querying
      • List of tables for BSM:
        • wydot_bsm_core
        • wydot_bsm_partii
        • wydot_bsm_partii-crumbdata
      • List of tables for TIM:
        • wydot_tim_core
        • wydot_tim_advisory (empty)
        • wydot_tim_path_offset_ll (empty)
        • wydot_tim_path_offset_xy (empty)

Items to Complete before the Sprint End

  • Loading of all legacy CVPEP Data Warehouse tables into the SDC Data Warehouse
  • Testing of data ingest
    • Through the Kinesis Firehose
    • Through the S3 ingest buckets

Items to Demonstrate

  • “Relational” tables (WYDOT BSM and TIM)

ODE: Sprint 36

 Click here to expand...

Sprint Work-Items:

key summary type assignee status resolution
Loading...
Refresh


Demo Overview:


In-Progress work-items:

key summary type assignee status resolution
Loading...
Refresh

Backlog Discussions


ODE Calendar & Upcoming Events

Nov 2018WyDOT 400 Vehicle rollout
Q1 2018WyDOT Production SCMS Environment