Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

Date

Participants

Goals

Discussion topics

Time

Item

Presenter

Notes

Confluence Update

  • We received approval on 5/16 and began sending invites to people who need access.

    • Let Sudhakar know if you haven’t received an invite and need one.


Updates from Last Week


  • No changes to vision from last week.

Epics and feature map

  • Sudhakar received EPICs from Tony

    • We now have EPICs from all 4 product lines

    • Sudhakar has begun to map features but many of the EPICs need to be re-written to match the common format that we’re looking for

    • V2X Hub EPICs were structured like features, so there was a lot of overlap that will require adjustment

    • ODE has all EPICs in the spreadsheet.

      • Hamid has added thoughts about the features and is waiting on Tony’s input

  • Tony thinks that the EPIC should be at the higher level and that user stories should line up with features because its difficult to distinguish them in Jirra.

    • The model isn’t EPIC → Feature → User Story

      • They’re all blended together rather than being distinct pieces in Jirra.

  • Tony walked everyone through the hierarchy in the spreadsheet that explains how our backlog matches up with the national architecture.

    • Everyone has agreed to stop at the feature level within their own Jirra’s and then build out the EPICs separately

      • Each EPIC would include an EPIC, a feature, and a user story

    • How do we avoid confusion if multiple teams are working at the same requirement level?

    • How is this spreadsheet going to be useful for us?

      • It allows us to distinguish between situations where there is overlap and situations where the teams are complementary to each other

      • It can lead to a healthy discussion about how to handle overlapping requirements on a case-by-case basis as they’re not black and white

  • Data distribution system and data security are the two main areas where Sudhakar believes CARMA will have overlap

  • V2X Hub and ODE have overlap possibilities because of hosting data

Milestone Checkup

  • Sudhakar talked to Deb and the goal is to flush out the EPICs and Features by the end of the month.

  • We don’t have more milestone data available because we don’t have the contract yet.

Action items

  • All the products should go through and create some lower level EPICs that could go into the Feature column
  • Sudhakar to email Deb and Ariel about having a milestone of next meeting for completing the EPICs and Features
  • Each group to create some examples of overlap scenarios that could arise
  • All teams to finish updating spreadsheet with EPICs by 5/23

Decisions

  • No labels