CAVe-in-a-box Inventory
Status Key (copy/paste these status buttons to update):
Checked out: the unit is in use by someone else (e.g., alpha tester, STOL staff, etc.).
Available: the unit is not in use by anyone and is ready for loan/use.
Temporarily Unavailable: the unit is currently not available but will be soon (e.g., en route to the STOL from an alpha tester, maintenance is being done, etc.).
Unit Name | Type of Kit | Status | Location | Internal/External Use | C-V2X or DSRC | Notes | |
---|---|---|---|---|---|---|---|
1 | Ole' Bessie | Infrastructure | Checked out | Internal Project |
| C-V2X | Not for loan |
2 | Bobby | Infrastructure | Available | STOL |
|
|
|
3 | Eva | Infrastructure | Checked out | Kennesaw State |
| DSRC | Assembled by Kennesaw State |
4 | Ander | Infrastructure | checked out | FIT |
| DSRC |
|
5 | Lila | Infrastructure | checked out | FAV Summit |
| DSRC |
|
6 | Ruby | Infrastructure | Checked out | University of Memphis |
| DSRC |
|
7 | Turner | Mobile | Checked out | Kennesaw State |
| DSRC | Assembled by Kennesaw State |
8 | Bella | Mobile | checked out | University of Memphis |
| DSRC |
|
9 | Willow | Mobile | checked out | Internal Project |
|
|
|
10 | Jagger | Mobile | checked out | USF |
|
| (through Amir) |
11 | Farley | Mobile | Available | STOL |
|
| Incomplete |
12 | Brutus | Infrastructure | checked out | Internal Project |
| DSRC | Ruggedized kit |
13 | Lance | Infrastructure | Checked out | Internal Project |
| DSRC | Ruggedized kit |
14 | Claire | Mobile | Checked out | FIT |
| DSRC |
|