Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 5 Next »

Status Key (copy/paste these status buttons to update):

  • CHECKED-OUT: the unit is in use by someone else (e.g., alpha tester, STOL staff, etc.).

  • AVAILABLE: the unit is not in use by anyone and is ready for loan/use.

  • TEMPORARILY UNAVAILABLE: the unit is currently not available but will be soon (e.g., en route to the STOL from an alpha tester, maintenance is being done, etc.).

Unit Name

Type of Kit

Status

Location

Notes

1

Ole' Bessie

Infrastructure

CHECKED OUT

Internal Project

Not for loan

2

Bobby

Infrastructure

CHECKED-OUT

Internal Project

3

Eva

Infrastructure

CHECKED-OUT

Kennesaw State (Parth Bavsar)

Assembled by Kennesaw State

4

Ander

Infrastructure

AVAILABLE

STOL

5

Lila

Infrastructure

CHECKED-OUT

FIU (Mohammed Hadi)

6

Ruby

Infrastructure

AVAILABLE

STOL

7

Turner

Mobile

CHECKED-OUT

Kennesaw State (Parth Bavsar)

Assembled by Kennesaw State

8

Bella

Mobile

AVAILABLE

9

Willow

Mobile

CHECKED-OUT

FIU (Mohammed Hadi)

10

Jagger

Mobile

TEMPORARILY UNAVAILABLE

STOL

Incomplete

11

Farley

Mobile

TEMPORARILY UNAVAILABLE

STOL

Incomplete

12

Unnamed Kit

Mobile

CHECKED-OUT

ADAStec

  • No labels