Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 4 Next »

Status Key (copy/paste these status buttons to update):

  • CHECKED-OUT: the unit is in use by someone else (e.g., alpha tester, STOL staff, etc.).

  • AVAILABLE: the unit is not in use by anyone and is ready for loan/use.

  • TEMPORARILY UNAVAILABLE: the unit is currently not available but will be soon (e.g., en route to the STOL from a tester, maintenance is being done, etc.).

Unit Name

Type of Kit

Status

Location

Notes

1

Ole' Bessie

Infrastructure

CHECKED OUT

Internal Project

Not for loan

2

Bobby

Infrastructure

CHECKED-OUT

Internal Project

3

Eva

Infrastructure

CHECKED-OUT

Kennesaw State (Parth Bavsar)

Assembled by Kennesaw State

4

Ander

Infrastructure

AVAILABLE

STOL

5

Lila

Infrastructure

CHECKED-OUT

FIU (Mohammed Hadi)

6

Ruby

Infrastructure

AVAILABLE

STOL

7

Turner

Mobile

CHECKED-OUT

Kennesaw State (Parth Bavsar)

Assembled by Kennesaw State

8

Bella

Mobile

AVAILABLE

9

Willow

Mobile

CHECKED-OUT

FIU (Mohammed Hadi)

10

Jagger

Mobile

TEMPORARILY UNAVAILABLE

STOL

Incomplete

11

Farley

Mobile

TEMPORARILY UNAVAILABLE

STOL

Incomplete

12

Unnamed Kit

Mobile

CHECKED-OUT

ADAStec

  • No labels