Status Key (copy/paste these status buttons to update):
CHECKED OUT: the unit is in use by someone else (e.g., alpha tester, STOL staff, etc.).
AVAILABLE: the unit is not in use by anyone and is ready for loan/use.
TEMPORARILY UNAVAILABLE: the unit is currently not available but will be soon (e.g., en route to the STOL from an alpha tester, maintenance is being done, etc.).
Unit Name | Type of Kit | Status | Location | Internal/External Use | C-V2X or DSRC | Notes | |
---|---|---|---|---|---|---|---|
1 | Ole' Bessie | Infrastructure | CHECKED OUT | Internal Project | C-V2X | Not for loan | |
2 | Bobby | Infrastructure | AVAILABLE | STOL | |||
3 | Eva | Infrastructure | CHECKED OUT | Kennesaw State | DSRC | Assembled by Kennesaw State | |
4 | Ander | Infrastructure | CHECKED OUT | FIT | DSRC | ||
5 | Lila | Infrastructure | CHECKED OUT | CSULB | DSRC | ||
6 | Ruby | Infrastructure | CHECKED OUT | University of Memphis | DSRC | ||
7 | Turner | Mobile | CHECKED OUT | Kennesaw State | DSRC | Assembled by Kennesaw State | |
8 | Bella | Mobile | CHECKED OUT | University of Memphis | DSRC | ||
9 | Willow | Mobile | CHECKED OUT | Internal Project | |||
10 | Jagger | Mobile | CHECKED OUT | USF | (through Amir) | ||
11 | Farley | Mobile | AVAILABLE | STOL | Incomplete | ||
12 | Brutus | Infrastructure | CHECKED OUT | Internal Project | DSRC | Ruggedized kit | |
13 | Lance | Infrastructure | CHECKED OUT | Internal Project | DSRC | Ruggedized kit | |
14 | Claire | Mobile | CHECKED OUT | FIT | DSRC |